Compare source-reviewed implementation status across the GCC and selected Asian investment hubs, while keeping unverified rule-level positions visibly pending.
Source-backed staging data. A domestic top-up tax, IIR and UTPR are separate rules. A pending row is not evidence that a rule is absent. Source review date: 2026-09-03.
8 of 8 records
Pillar Two implementation tracker
Jurisdiction
Headline treatment
Verification
What it means
Timing
Source
Qatar
In force
Source reviewed
Domestic Minimum Top-Up Tax (DMTT) and Income Inclusion Rule (IIR). Applies to in-scope multinational groups, not every business.
Fiscal years commencing on or after 1 January 2025.
A selective, source-reviewed record of material historical changes behind the current tracker position. Values labelled “at this date” are historical states, not today’s rate or status.
Historical timeline — not current rates.The current tracker position is shown on every card and in the table above.
7verified changesEvery entry links to the public source used for the history record.
Rule effectiveQatar
Current tracker positionIn force
Before this changeQatar Pillar Two framework not yet effective
Changed at this date toDMTT + IIR effective for in-scope MNE groups
Qatar's Global and Domestic Minimum Tax framework applies a Domestic Minimum Top-Up Tax and Income Inclusion Rule to in-scope multinational groups.
Why it matters
For large groups, the jurisdiction-level tax outcome can no longer be assessed only through Qatar's ordinary corporate-tax and incentive rules.
Changed at this date toDomestic top-up tax effective for in-scope MNE groups
Kuwait implemented a domestic top-up tax for multinational groups within scope from tax periods starting on or after 1 January 2025.
Why it matters
The measure creates a separate minimum-tax layer for large multinational groups and should not be confused with Kuwait's ordinary foreign-corporate income-tax regime.
Scope The headline field reflects the verified implementation position in the shared Tax & Markets benchmark, not a full GloBE applicability analysis.
Status control Where the source set does not support a conclusion, the row remains marked verification pending rather than inferring implementation.
Change history The history records verified effective milestones only. Historical states are shown separately from the current tracker position, and a DMTT, IIR and UTPR remain separate rules. History reviewed 10 September 2026.